Conducting a BRE Digest 365 Soil Percolation Test
Before building control signs off a soakaway design, builders must verify that the ground absorbs water quickly enough. The test involves digging a trial pit matching the proposed soakaway depth, filling it rapidly with water three consecutive times, and timing how long water takes to drop between 75% and 25% depth.
In free-draining chalk or sandy gravel subsoils, water drains swiftly, yielding high soil infiltration rates. In dense Buckinghamshire London Clay, water may pool for days, indicating that traditional soakaways are unviable and requiring surface water attenuation or council-approved storm sewer connections.
| Subsoil Classification | Percolation Feasibility | Typical Soil Infiltration Rate | Drainage Recommendation |
| Chiltern Upper Chalk | Excellent | > 1 x 10⁻⁴ m/s | Standard modular geocellular crates |
| Thames Valley River Gravel | Very Good | > 1 x 10⁻⁴ m/s | Compact crate system with silt trap |
| Sandy Loam | Good to Moderate | 1 x 10⁻⁵ m/s | Expanded crate footprint required |
| Dense London Clay | Unviable | < 1 x 10⁻⁶ m/s | Attenuation tank with restricted sewer discharge |
- Trial pit dimensions: Typically 1.5m to 2.0m deep and 0.3m to 1.0m wide.
- Three consecutive fills: Simulates saturated ground conditions during prolonged winter storms.
- Soil infiltration rate (V): Calculated in metres per second to size crate volume accurately.
- Water table check: Soakaway base must remain at least 1.0m above winter groundwater levels.
Modern Geocellular Attenuation Crates vs Rubble Pits
Traditional soakaways consisted of holes backfilled with broken bricks and building rubble. These old pits had void ratios of barely 40% and quickly silted up with leaves and sand within a decade.
Modern installations use modular polypropylene geocellular crates (such as Polypipe Polystorm) offering a 95% void volume. Crates are wrapped completely in needle-punched non-woven geotextile membrane to allow water to filter out into surrounding soil while preventing fine sand from entering the storage tank.
Silt Traps and Pipe Fall Gradients
Connecting rainwater downpipes directly into soakaway crates will cause leaf grit and roof moss to fill the crates over time. Builders install an inline silt trap inspection chamber upstream of the crates to catch solid debris.
Connecting pipework runs at a minimum fall of 1:100 using 110mm underground drainage pipe bedded in 10mm pea shingle to ensure clean self-cleansing water delivery.