Sub-Base Engineering and Slurry Priming
Porcelain paving requires a rigid sub-base. ASR Builders installs 100mm to 150mm of compacted MOT Type 1 aggregate followed by a full wet sand-and-cement mortar bed.
Every porcelain slab receives a polymer-modified bonding primer applied to its reverse side before laying, ensuring permanent adhesion to the bed.