Replacing the Garage Door: Infill Brickwork and Foundations
Removing the metal garage door leaves a wide opening requiring structural infill. Builders dig a small concrete trench foundation or tie into the existing slab threshold before laying matching facing bricks and thermal blocks to window cill height.
Installing a high-efficiency double-glazed or triple-glazed window above the brick infill brings natural daylight into the workspace. The new brickwork must incorporate stainless steel wall starters to tie securely into the existing brick reveals.
| Conversion Component | Cold Garage State | Finished Office Standard | Material Cost Band |
| Entrance Opening | Uninsulated steel up-and-over door | Infill brickwork + double-glazed window | £2,200 - £3,600 |
| Floor Build-Up | Bare 100mm uninsulated concrete slab | DPM + 100mm PIR + 22mm T&G floor deck | £1,400 - £2,400 |
| Wall Insulation | Single-skin 102mm cold brickwork | Treated studwork + 100mm PIR + SoundBloc | £2,600 - £4,200 |
| Electrics & Heating | Single lightbulb & no heating | Consumer unit, Cat6, LED spots, electric radiator | £2,200 - £3,800 |
- Foundation footing: 450mm deep concrete trench to carry the weight of new brick infill.
- Brick matching: Sourcing facing bricks that match the weathered colour of the main house.
- DPC bridging: Ensuring the new damp proof course links into existing wall courses.
- Glazing specification: Low-E glass with trickle ventilation to prevent indoor air stagnation.
Thermal Insulation: Eradicating Cold Floors and Condensation
Standard garage concrete floors absorb cold groundwater from beneath. Builders roll a continuous 1200-gauge damp proof membrane across the slab, followed by 100mm rigid PIR insulation boards taped at every joint with aluminium foil tape.
Over the insulation, contractors lay 18mm or 22mm moisture-resistant tongue-and-groove chipboard or a thin screed layer. External perimeter walls receive 100mm PIR insulation between treated timber studwork, preventing cold bridging and condensation mould.
Acoustic Soundproofing and Power Infrastructure
For remote workers making daily video calls, external road noise and household sounds must be dampened. Applying high-density acoustic plasterboard (SoundBloc) over resilient sound-isolation channels reduces sound transmission by up to 45 decibels.
Electrical work includes running a dedicated 32A ring circuit with surge-protected double sockets, recessed LED spotlights, and a hardwired Cat6 or Cat6a ethernet cable back to the main router.